厂区
2.Optimization design and operation of CWS system in Wanfeng heat power plant
3.Basically there are there patts to the plant;the supply area, the assembly area and the dispatch area.
4.The construction works will start in October 2006 and the start of production will be by end of 2007.
5.Lead warehouse tem to be responsible of the administration of all material in warehouse.
6.Does the lighting outside your factory premises cover all parking areas?
7.Patrol the premises to prevent and detect signs of insecure existences.
8.Participate in equipment engineering projects, e.g. equipment upgrading and TCO projects in the plants to achieve higher efficiency.
9.Article 3 of salt from the highway Ningjing big mound and 1.8 kilometres east Yancheng airports, ports, railway stations, 204 State Road and Tong Yu River 20 km.
10.Plant area: 81,000 M2, of which , the construction area is 19,000 M2. The land using rights of an area of 64619.9 M2 were obtained in the way of remise.

