变电室
1.3 shaft on Aug, 1989, abd finished the main body construction on May, 1991.The building of pump station and central switching room in-240m section to complete the drainage system of the shaft was the key project of Yinshan in 1994. This article makes a brief description on the excavation of pump station and central switching room by digging leading adit.

