1.3 shaft on Aug, 1989, abd finished the main body construction on May, 1991.The building of pump station and central switching room in-240m section to complete the drainage system of the shaft was the key project of Yinshan in 1994. This article makes a brief description on the excavation of pump station and central switching room by digging leading adit.
如何开挖该竖井-240m中段水泵房和中央变电,形成完善的竖井排水系统,加快银山西区开拓,是银山矿1994年的重点工程. 本文就应用导坑——留矿法开挖3~#竖井-240m中段水泵房和变电的实践作一扼要述评.收藏指正