班期
1.Without the operation qualification for international liner shipping a party may not engage in the business operations of international liner shipping, and may not release the schedule to the public or accept booking for shipping space.
2.The 21000 DWT multi-purpose ship is a liner of shanghai Ocean Shipping Company on south America route. According to the comprehensive analysis on voyage, ship numbers and schedule. the main engine delivered power of 7239. 75 kW is required to reach the ship speed of 16. 5 kn.
3.By comparing and studying the weekend leagues and the centralized tournaments of ball games in our country and the world,and by analysing the experimental result of the weekend league,conducted by the students specialized in volleyball in BUPE,it was suggested that the centralized tournament with long preparatory periond must be replaced by the weekend league with long competitive period.
4.In first periodical of homepage, we put the photo which was Ven.Shinhong teacher and SBA students taken in font of Big Buddha statue in China.
5.The eustatic sea-level changes control the early Late Bajocian sea-level change in the Yanshiping area,while the volume change of the regional oceanic basin caused by northward subduction of the Bangong Co-Nujiang suture is the primary factor responsible for the sea-level change during the latest Bajocian-early Bajthonian.

