1.Through the field observation and comparative seism-geologic studies, many seism-genesis soil-layer structures such as vibration-liquefied sand vein, vibration-liquefied sand dyke, sandy cobble dyke by fissure filling, seismic fall mass, seismic intra-layer fault and seism-settlement structures etc. were recognized .
通过野外观测和比较地震地质学研究,识别出了振动液化脉、液化、裂隙充填质卵石、震塌落体、地震层内断裂及地震沉陷构造等地震成因土层构造。收藏指正
2.In this paper, using the nonlinear finite element analysis, the stress-strain in the Hua Liang Ting Earth Dam is calculated to investigate the cause of longitudinal cracks in the watertight core.
本文对已建成的花凉亭土坝静应力应变进行有限单元非线性分析,以便探讨粘土心壳混合式坝型的坝体固结情况及心、铺盖的应力状态,并对花凉亭土坝心纵向裂缝成因进行了综合分析。收藏指正
3.Practices show that the compressive strength, the modulus of elasticity, the permeability coefficient and the compactness of concrete obtained respectively by the compaction method, the unconfined compression static compaction method, the sand trenching and filling method, and nuclear densimeters meet the requirement of design, and the mixing proportion of concrete of the side-wall is reasonable.
实践证明施工中用击实法、无侧限抗压静力压实法、挖坑灌法及核子密度仪分别检测出的边混凝土抗压强度、弹性模量、渗透系数和密实度值均满足设计要求,边混凝土配合比合理。收藏指正
4.So far as the mixing material for building the earthrock fill dam with clay core for Shiquanhe Hydropower Station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of (46~54):(54~46) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core.
摘要由于狮泉河水电站粘土心土石坝掺合料的最大干密度受反滤料与粘土料的掺合比例、反滤料含率的影响较大,因此拟通过本试验确定掺合质量比在(46~54):(54~46)范围变化时,反滤料含量变化对最大干密度的影响程度及相关参数,从而确定心掺合料填筑的实际压实度。收藏指正
5.A brief introduction is given to the treatment of the Zeya dam foundation,principles of seepage control and design of the concrete face rockfill dam of the Zeya reservoir.As for the excavation of the sand-gravel zones,except the toe slab and its 1/9 bottom width down stream,the alluvial layers are excavated to the micro-weathered rocks,while the other sections remain unexcavated.Regarding to the treatment of the fracture zones,concrete filling is used for the toe slabs and semi-permeable materials are used for other section.According to the construction characteristics,a filter is placed in the down stream embankment foot.To improve the integrity of the dam foundation and anti-seepage capability consolidation grouting and curtain grouting are adopted.As a result safety,economic benefit,convenience in construction and good performace are achieved.
介绍碧莲水电站拦水坝系软基上的水力自控翻板闸门溢流坝工程特点和设计原理.闸门利用水力和杠杆原理实现自控关闭;闸坝平时挡水发电,洪水期自动翻倒泄洪冲,有效地解决洪水对上游库区实物的淹没损失及水库泥沙淤积问题;闸坝采用地下混凝土连续进行地基防渗处理及面流消能,消能效果显著,工程投资少.本工程设计可供其它建固定坝淹没损失过大或在软基上建低重力式堰坝的类似工程参考.收藏指正
6.The study indicated that asphalt concrete core wall of Majiagou reservoir seeped terribly because of the fissure appearing between ZK7 and ZK7-1 and between ZK7-2 and ZK8. A central water leakage path was found out along the fault of F16 to the right sandless pipe in the right dam of Jicun hydropower station.
探查表明,马家沟水库沥青混凝土心在ZK7与ZK7-1之间、ZK7—2与ZK8之间存在严重裂缝性渗漏; 纪村水电站右土坝基岩中存在沿F16断层向右无管排泄的集中渗漏通道。收藏指正
7.In the meantime,issues like sand compaction piles installed between the two new anchorage walls to ensure the coordinated working of the two types of sheet piling systems are also expounded in detail.
为进一步提高断面承载能力对全遮帘桩前加短桩方案也进行了计算分析,对为保证两套板桩系统协同工作而在两道新锚碇之间挤密桩的设置等问题做了较详细的论述。收藏指正