爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Hutiao Xia
2.In this paper, two methods were applied to calculate the PMP of the basin between Benzilan and the Hutiao Gorge Dam of the Hutiao Gorge hydro-power station: the combined storm maximization and the local storm maximization.
虎跳峡水电站奔子栏至虎跳峡坝址区间流域可能最大暴雨计算 ,采用了当地暴雨放大和组合暴雨放大两种方法。收藏指正
3.Several horizontal push-shear in-situ tests on SRM in an immersion state under water were carried at Long pan slope in Tiger-Leaping Gorge, and some significant conclusions were drawn.
摘要以虎跳峡龙蟠右岸地区分布的土石混合体为依托,对土石混合体在浸水条件下的力学响应进行了大型原位水平推剪试验,取得一些成果。收藏指正
尝试查询