输水
5.The Application Results of Swift Hydraulic Pipeline and Several Energy Dissipaters
6.Investigation and treatment on Hazard of AAR on Water transport construCtion
7.Reasonable layout of adit in tunnel for water conveyance project of Dahuofang Reservoir
8.According to the Design Code for Filling and Emptying System of Shiplocks and the layout characteristics of the second line of Qililong Sea Route on Fuchun River and the upstream navigation tunnel, the type of the filling and emptying system of shiplocks is determined, the area of the culvert transect at the valve is calculated, and the layout type and key size of the filling and emptying system are recommended.
9.And because it is hollow, it can be fitted together and used. for pipes to carry water.
10.Remote Sensing Applying to the Geologic Survey of Yin-xi-ru-lan Transporting Water Engineering in Anshan City

