运行良好地
1.The system that designed and implemented in the thesis has been successfully run on CSST 340 production line.
2.The burners of 220 t/h boiler in Henan Shenhuolv Power Plant were retrofitted by using the pulverized coal burners with stabilized-firing cavity and cutting down the distance between up-primary air and down-primary air etc. technologies, thus the boiler was successfully converted from originally designed burning high calorific value coal to low calorific value coal, the boiler could operate stably at 50% load without oil-firing aid and the thermal efficiency of boiler reached 89%.
3.Abstract: Through a series of hydraulic model tests for researching actual power tunnel operation,a conclusion is reached that in order to get a better flow pattern the profile of the wate-carrying structure should be adapted to the variation of water streamline shrinkage,flow velocity and pressure intensity.The configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage.
4.The MSWA collects the running status of the WEB application from the exterior of the WEB application, analyses the error occurred and inform the system administrator. The using of MSWA ensure that the WEB application is in stable status.

