进港
6.CYH4536,HUANGHUA tower ,radar Contact ,information A available,follow KHN1A,descend and maintain 2700 meters on Standard.
7.Callsign),cancel (STAR), turn left / right heading (three digits)/ direct to (signification point), vectoring for final.
8.Callsign),Shanghai approach, radar contact, via (STAR),expected ILS / visual approach, runway (number), QFE/QNH(number).
9.The calculation results show a small decrease in ebb current velocity and a small increase in siltation in the entrance channel due to water intake effects.
10.On the basis of sediment concentration field, the annual back silting intensity on the approach channel of 70000 DWT at Lianyungang Harbor was also simulated, and the calculated results was coincident with actual data.


