送电
1.The Hydrological Analysis Method of the Aerial Transmission Line in the Store Floodwater Areas
2.Analysis on Problems in the Implementation of Standard for 500 kV EHV Transmission Line
5.Application of GPS and Aerial Surveying Technology to Open-wise Transmission Line
6.Work was accelerated to ensure that every county seat is served by asphalt roads, that every township has access to electricity, and that every village enjoys radio and television reception.
7.Development and Application of New Dig Foundation with Lateral Beam for Transmission Lines
8.HVDC transmission is with the characteristics of bng distance, large capacity and flexible control etc. for power transmission, which will undertake the major task of power transmission in building and planning HVDC transmission projects for power transmission from west to east, mutual power supply for south and north, and play the important role in future Nation - wide power network interconnection.
9.After the energization of station system commissioning, the unbalance current of all HV capacitor banks is within permitted.
10.The papers depend on the practice of hydrologial survey in overhead transmission line large crossing engineering on the Yellow River downstream,analyze the effect of the Yellow River downstream’s flood,alluvial,ice run etc. factors on overhead transmission lines engineering.


