隔水
3.As the waterproof technology with high work efficiency, threefold high-pressure jet grouting plays a vital role in the water-proof and seepage-proof project of deep foundation pits.
4.The paper has introduced grouting reinforcing technology in water-resisting floor at 23071 coal face in Fangzhuang Colliery,which has not only reinforced the floor,but also guarranted the safety production.
5.Soften the cream cheese with milk in a bowl. Add half of the caster sugar, egg yolks, cornstarch, lemon juice and combine together.
6.This Water-barrier Cultivation Cabinet is with digital display, microcomputer control, mirror finish stainless steel inner, double-layer door; the inner door is a glass door which is easy for observation, the slow air-circulation and heating will stop automatically when the glass door is open, with no over-shoot; water-barrier style heating mode, the temperature is even, and the temperature can still be constant for a long time when the power is cut off; timer available.
7.Sieve and fill the mixture in the caramel container, and bake in bain-marie for 30 minutes. Leave to cool. Invert to serve.
8.Calculation result shows that, under the effect of 60cm single layer flat ice in shallow offshore of Liaodong Bay, both the structure displacement and stress are within permissible range, the cement reinforced inside the riser plays a significant role in strengthening the structure.
9.As the construction of sightseeing tunnel at the Bund of Shanghai had faced with the extremely poor geological conditions and strict demands on environmental protection, some measures, such as: water seal in advance of lowering underground water level, semi contrary construction method, reinforced concrete support combined with steel support and foundation soil reinforcement, were adopted with rather satisfactory results, which may be regarded as references for similar projects.
10.The control point of quality (or quality control key element , become a key link ) is an important component in the quality system, fasten person who dig whole steel collet is it is it succeed of craft is it pour into quality control point of is it is it have concrete quality to stand up to summarize generally to holing inside to hole to follow up, the pipe , through water bolt, the irritating amount for the first time, bury the depth of managing, pour into it highly ,etc.

