爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.The trees, densely planted on a 10-foot-by-10-foot (3-meter-by-3-meter)grid, saturate the space of the court.
树阵浓密的以10英??10英?眨?公尺*3公尺)的规线种植,充满整个前庭。收藏指正
2.3-meter springboard and 10-meter platform were the only two diving events represented at the past Olympics.
过去的奥运会只有单人3米跳板和单人10米跳台。收藏指正
3.Wu Minxia and her partner, Guo Jingjing, won the 3-meter springboard competition.
吴敏霞和搭档郭晶晶赢得了3米板的冠军。收藏指正
4.A 3-meter in length, 2-meter width and 3-meter height, giant cake made of 300 kg non food chocolate in 20 days by 5 chefs is a replica of mosque in Baghdag, Iraq.
这个长3米、宽2米、高3米的蛋糕仿照了巴达的一座清真寺的外型,共使用300公斤巧克力由5位厨师耗费20天时间完成。收藏指正
5.The two divers of a team perform either on the 3-meter springboard or 10-meter platform using the same, or similar, dives.
同组的两名运动员用相同或相似的动作进行3米跳板或10米跳台跳水。收藏指正
6.Metaods: Using 0.6 cm3 ionization and standard model and IONX2500/3 meter to measure absorbed dose of different energy electrons beams fixed applicator of Philips SL75-14 linear accelerator and also the dose of irregularly electrons beams applicator calculate by equivalent squares equation in this research.
采用标准水模及IONX2500/3型剂量仪,0.6cm3电离室,对Philips SL75-14型直线加速器不同能量电子束固定限束筒、等效方野公式推算所得相应限束筒不规则野的吸收剂量进行了实测。收藏指正
7.And finally, the next day he led the Finns to victory in the 3,000-meter team race.
在随后的第二天,他又在3000米团体赛中率领芬兰人取得胜利。收藏指正
8.3×40 Meter Consecution Beam Empress Piece the Method Double Prepare to Curve in Response to the Dint Reinforcing Bar the Piece Pull to Control the Technique Measure
3×40米连续梁后张法双向曲线筋张拉控制技术措施收藏指正
9.This paper expounded the structure,the performance and the operational method of Model WRM-3 wire-recording meter —— a dual purpose convergency meter for the measurement of drift convergency,and on the basis of site test and case analysis,revealed the law of the variation of drift convergency (deformation)with the lapse of excavation time.
本文阐述了用于巷道收敛测量的WRM- 3 型丝尺两用收敛计的结构组成和性能以及操作使用方法。 通过现场实例测试与分析,揭示了巷道收敛( 变形) 随着开挖时间推移的变化规律。收藏指正
10.In order to locate the correct leakage position in the high-pressure grouting walls and foundation, Type GDP-32Ⅱ Instrument based on transient (time domain) electromagnetic technique and EM34-3 Ground Conductivity Meter based on frequency domain electromagnetic technique were employed.
作者采用基于时间域电磁法原理的GDP-32Ⅱ型瞬变电磁仪和基于频率域电磁法原理的EM34-3型大地电导率仪进行渗漏检测和定位。收藏指正
尝试查询