absolute growth
5.Maximum absolute growth rate(3.3533g/m2.d,DM)of above ground biomass occurred on June 20 to July 5,and maximum relative growth rate(0.0662g/g·d,DM)of aboveground biomass occurred on May 20 to June 5.There was a negative increase in both absolute growth rate(AGR)and relative growth rate(RGR) in the late growing season.

