blast control
1.To ensure the completion of the gate slot widening of Huangling Water Gate in Wuhan on time,blast cutting was adopted instead of the traditional hand cutting On the basis of selection of blasting scheme,optimization of blasting parameters and two blast monitoring control experiments,success was made in the slot gate widening as scheduled.

