blueprint paper
2.Although the design of floor heating does not have a problem, but if blueprint paper was not pressed completely in worker construction process,operate, jerry to reduce cost, reduce the laid length of pipe for instance, increase the space of conduit, also can cause central heating to be not heated up.

