breakwater
2.The breakwater sustains the shock of the great waves.
3.Experimental Study of Oblique Wave Force Acting on a Vertical Breakwater Head
5.Treatment of breakwater soft foundation by sand bags and dewatering plastic sheet can fully satisfy the project need.
6.The Semi-Circular Breakwater is a new type Breakwater.Owing to the Semi-Circular in structure it has much advantage over other Breakwater.The analyses on the structural feature and breakwater function of power plants are involved.The analyses on the Semi-Circular breakwater hydraulic characteristics and virtues are involved.So it can be used in the water-constructers of power plant.
7.According to our national norm, the weight of the core of rubble mound breakwater should be 10kg~ 100kg.
8.The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
9.Influences on the Physical and Dynamical Characteristics of Rubble Breakwater Caused by Various Weight Distribution of the Core
10.Abstract: The offshore breakwater of Dayaowan 1st-phase project adopted “ comb” structure, which successfully solved the technical problems of both wave absorption and permeation.


