爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.To improve the reliability of communication, the rule of point-to-point error control and the addition of a byte of check sum are introduced into the system.
在通信中,提出了增加一个字节校验和以及端端差错控制的通讯机制,提高了系统通信的可靠性;收藏指正
2.Third, check up on their work, and help them sum up their experience, carry forward their achievements and correct their mistakes.
第三,检查他们的工作,帮助他们总结经验,发扬成绩,纠正错误。收藏指正
3.Check A check is a written order by an account holder to his bank to pay a certain sum of money to the payee. A check is not legal tender.
支票账户持有人要求银行支付一定金额给收款人的书面命令。支票不是法定清偿。收藏指正
4.Check A check is a written order by an account holder to his bank to pay a certain sum of money to the payee.
支票账户持有人要求银行支付一定金额给收款人的书面命令。收藏指正
5.The mathematical statistics theory and the SUM, the SUMSQ and the FINV functions in the Excel was applied to analyze and treat with the data in the equipment check and design modification in site for Iran ARAK 4X325 MW steam power plant project.
应用数理统计理论和Excel中的求和函数SUM、求平方和函数SUMSQ和F分布函数FINV,对伊朗ARAK4X325MW电厂项目中的物资清点、设计更改等数据进行了方差分析和计算机计算处理。收藏指正
6.An algorithm to resolve the coupling effect problem is proposed during the cross point assignment (CPA) stage.In the algorithm,the priority queue concept and the rip-up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance.First,the nets are arranged into different priority queues according to their weighted sum of their length and criticality.Then,the CPA problem for one queue of nets is translated into a linear assignment problem.After the assignment of one queue of nets,a post-CPA checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned.The algorithm is tested by a set of bench mark examples,and the experimental results are promising.
提出了一种在过点分配阶段解决噪声耦合效应问题的算法.该算法采用优先队列同拆线重布策略相结合的方法,控制由互连线耦合电容引起的串扰噪声.算法中,首先按照线长和约束限制,将线网划分到若干个优先队列中.然后,将每个优先队列的过点分配问题转换为线性分配问题.在完成一个线网队列的分配后,通过过点分配后处理过程检查串扰约束满足情况,对违反约束的线网对进行拆除,放入后续线网队列进行重新分配.实验数据表明,该算法能够取得好的效果.收藏指正
7.Abstract: An algorithm to resolve the coupling effect problem is proposed during the cross point assignment (CPA) stage.In the algorithm,the priority queue concept and the rip-up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance.First,the nets are arranged into different priority queues according to their weighted sum of their length and criticality.Then,the CPA problem for one queue of nets is translated into a linear assignment problem.After the assignment of one queue of nets,a post-CPA checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned.The algorithm is tested by a set of bench mark examples,and the experimental results are promising.
文摘:提出了一种在过点分配阶段解决噪声耦合效应问题的算法.该算法采用优先队列同拆线重布策略相结合的方法,控制由互连线耦合电容引起的串扰噪声.算法中,首先按照线长和约束限制,将线网划分到若干个优先队列中.然后,将每个优先队列的过点分配问题转换为线性分配问题.在完成一个线网队列的分配后,通过过点分配后处理过程检查串扰约束满足情况,对违反约束的线网对进行拆除,放入后续线网队列进行重新分配.实验数据表明,该算法能够取得好的效果.收藏指正
尝试查询
汉英释义