爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.6 Before commencement of works, the Permit Holder shall conduct a site assessment on land contamination in accordance with the Environmental Protection Department Practice Note for Professional Persons (ProPECC) PN 3/94 to establish the site condition before construction and operation of the temporary bus depot.
在展开工程之前,许可证持有人须按照环境保护署发出的《专业人士环保事务谘询委员会专业守则3/94》进行土地污染评估以确定在建造及营运临时巴士车之前土地的情况。收藏指正
2.Following a review of the procedures, measures have been introduced to shorten the lead time from inception to commencement of construction of a capital works project.
检讨有关程序后,当局实施精简程序措施,缩短工程项目由构思至施工所需的筹备时间。收藏指正
3.6 Three sets of a method statement for the dredging, stockpiling and transportation of sediment; and the stockpiling and transportation of construction waste and excavated material from within the works boundaries shall be deposited with the Director before the commencement of construction of the relevant works of the Projects.
在展开建造有关工程之前,须向署长存放3套关于工程界线内沉积物的浚挖、堆存及运送,以及建筑废料和挖出物料的堆存及运送的方法说明,以待批准。收藏指正
尝试查询