爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Analysis to the Seismic Stability of Dam Slope Made of Saturated Cohesionless Soils
饱和非粘性土地震稳定性的分析收藏指正
2.Top soil masses of dam slope soak and produce wetting more easily than low soil of slope in spite of rainfall intensity.
不管降雨强度如何,顶和中上部比体的中下部更容易受降雨浸湿。收藏指正
3.The effects of the stratification of rockfill on the seepage field and the stability of the dam slope were highlighted.
指出填料严重分层后对体渗流场的影响以及对渗透稳定性的不利影响。收藏指正
4.In this paper the two dimensional effective stress dynamic method is used to study earthquake liquefaction of the sand foundation and the dynamic stability of the south aux- iliary dam slope of the Ce-Tian Reservoir, Shan-Xi Province.
本文采用二维有效应力动力分析方法,对山西省册田水库南副地基砂层进行了地震液化分析和动力稳定分析。收藏指正
5.The Analysis of Right Bank Dam Abutment Slope Stability and Research of Reinforcing Scheme of Dongfeng Hydropower Station
东风水电站右肩边稳定分析及加固处理方案研究收藏指正
6.The current state and advance in the research of anchorage property of reinforced rockmass under earthquake both in and outside China are systematically presented,including the research of the change in prestress and axial force of bolt, failure modes of bolt, failure modes of shotcrete and bolt support and its shock resistance, the usage of anchor in dam foundation and slope consolidation, the performance, damage and defermation of anchorage device.
系统论述了地震作用下岩体锚固性能的国内外研究现状和进展,包括锚杆预应力和轴力变化、锚杆破坏形式、喷锚支护破坏形式及抗震性能研究以及锚索在加固基和边中的运用、锚具性能研究、损伤和变形研究等。收藏指正
7.With the maximum dam height of 292.0m, the excavation of dam abutment formed a side slope as high as more than 400m, whose stability is of vital importance to the dam safety.
小湾拱最大高292.0m,肩槽开挖所形成的高边达400多米,其稳定性至关重要。收藏指正
8.Phase Ⅱ materiais of cushion layer for dam hody and construction measurement control of slope of Wuluwati Facing Slab Dam
乌鲁瓦提面板堆石二期体垫层料及面施工测量控制收藏指正
9.Finite Element Analysis of Embankment Dam with Bitumen Concrete Inclined Core under Different Slope
不同斜率下沥青混凝土斜心墙土石有限元分析收藏指正
10.The rockmass safety monitoring in hydroelectric project is made mainly for rock foundation of dam, surrounding rockmass of underground chambers, artificial slope and natural slide, etc.
水电工程岩体安全监测的对象主要有大岩基、地下洞室围岩、人工边和天然滑等。收藏指正
尝试查询
汉英释义