debris dam
2.Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well.

