爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Problems encountered in commission debugging of the unit and in process of 168 h trial operation as well as solving measures is expounded in details,so as to provide with reference for the same kind of units.
详细介绍了机组运行调试和168小时试运过程中遇到的问题以及解决办法,以期对兄弟单位同类型机组的运行维护有借鉴作用。收藏指正
2.For installing and debugging the steam-turbine unit No.3 and No.4 of N125-13.24/535/535-Ⅱ in Meixian Power Plant, some measure to prevent the flexure of rotor had been adopted and what cause the faults of speed control and protection system are analyzed.
摘要简要介绍N125-13.24/535/535-Ⅱ型汽轮机在梅县发电厂#3、#4机组工程的安装、调试过程中防止转子弯曲而采取的一些措施,分析调速保安系统出现故津的原因及其处理经脸。收藏指正
3.Analysis on 330MW generation unit simulating system development and debugging based on virtual DPU technology
浅析基于虚拟DPU技术的330MW机组仿真系统开发与调试收藏指正
4.Describes the concept of virtual DPU, introduces 330MW generation unit simulating system development and debugging based on virtual DPU, puts forward debugging principles of simulating system and taken measures aiming at the practical problems.
论述了虚拟DPU的概念,介绍了基于虚拟DPU开发的330MW机组的仿真机系统,同时提出仿真系统的调试原则和对实际问题采取的措施。收藏指正
5.The use of virtual distributed processing unit(DPU)in the plant simulator can implement the whole range simulation of control strategy in DCS, it is of significance for the training of plant operators and the debugging of DCS control strategy.
在仿真机中使用虚拟分散处理单元可实现电厂分散控制系统(DCS)中控制策略的全仿真,对操作员培训和DCS控制策略调试具有重要意义。收藏指正
6.The business scope includes: coarse efficiency particulate air filter, medium efficiency particulate air filter, high efficiency particulate air filter, HEPA(high efficiency particulate air filter) unit, air shower, pass box, clean bench, the laminar covers and other kinds of air purification product; and carry on clean workshop design, installment, debugging and examination.
业务范围包括:生产初、中、高效空气过滤器,高效送风口、风淋室、传递窗、洁净工作台、层流罩等各种空气净化产品;并承接无尘厂房的设计、安装、调试、检测等服务。收藏指正
7.Unit 2 of Huaneng Nanjing Power Plant,a supercritical pressure 320 MW steam turbine,carried out a retrofit for its turbine governing system. It was converted to the system without control actuating medium by using the force-driven mechanism. The paper briefed the process of retrofitting,the debugging and the effect after the retrofitting.
介绍了江苏华能南京电厂前苏联制造的2号320MW超临界机组设备概况,通过采用力驱动执行机构将汽轮机调节系统改为无控制工质纯电液调节系统的改造,给出了系统的改造方式、改造后调试过程及系统改造后取得的效果,为大机组调节系统的改造提供了良好的借鉴。收藏指正
尝试查询