爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.PRACTICE OF UPWARDS DRIFT HDRAULIC FILL MINING IN WUSHAN COPPER MINE
武山铜矿上向进路水砂充填采矿法生产实践收藏指正
2.Common Methods for the Treatment of Roof Collapse of Drift in Jinchuan Mining Area and Evaluation
金川矿区巷道冒顶处理的常用方法及评价收藏指正
3.The deformation characteristics and reasons of 1 178 sublevel drift of No.2 mining area of Jinchuan nickel mine
金川二矿区1178分段巷道变形破坏特征及原因收藏指正
4.Comprehensive Technical Study of Driving and Supporting for Drift in Powder Ore Mining
粉矿开采中巷道掘进与支护综合技术的研究收藏指正
5.STUDY ON SEDIMENTATION CHARACTERISTICS AND STRENGTH DISTRIBUTION OF FILL IN DRIFT CUT AND FILL MINING
巷道式充填法回采进路充填体沉积特征及强度分布规律研究收藏指正
6.For many years, because of the bad rock condition and big ground stress, it limited the main opening and the speed of drift driving seriously, directly affect the mining methodically.
多年来,由于金川岩体条件较差,地应力大,严重制约井下主要开拓、采准巷道的掘进速度,直接影响矿山生产有条不紊的进行。收藏指正
7.Rock and ore separate mining test in drift driving
沿脉巷道掘进岩矿分掘试验收藏指正
8.By systematic monitoring the stress-strain pattern of bottom drifts using JXH-2 concretestrain-wire gage, the stress-strain relation in slusher drifts was revealed, and it was foundthat there are two most dangerous periods of drift support during block caving mining,whichprovides a practical basis for ground control and monitoring in a block caving system.
在研究过程中应用JXH-2型混凝土应变计对矿块崩落法混凝土底部结构的应力应变进行了系统的监测,不仅摸清了在拉底及崩落出矿过程中,出矿巷道的应力应变变化规律,以及出矿巷道在生产过程中的2个破坏危险期,而且为矿块崩落法巷道支护及地压控制提供了依据。收藏指正
9.Practice of 43 regular operation cycles in atransportation drift at Maiiliang Mine of Datong Mining Bureau shows thatin the sandstone( f=6~8 ) drift(driving section 12.39m ̄2)using the new tech-nology of directional fracture blasting triangular compound cutting and me-dium-length bole blasting can give good blasting effect under the conditionof tbe existing air-leg rock drills, scraper rock loaders and mine-car trans-portation.
经大同矿务局马脊梁矿运输大巷43个正规作业循环实践表明:在f=6~8的砂岩中掘进断面12.39m ̄2的巷道时,在现有气腿式凿岩机、耙斗式装岩机和矿车运输条件下,采用定向断裂爆破新工艺、三角复式掏槽、中深孔爆破,可以取得良好的爆破效果。收藏指正
10.A Study on Rock Behavior in Drift Reinforced with Rock bolts-Cable bolts-MetalMesh at Full Mining Face of 15~# Seam in Guzhuang Coal Mine
固庄煤矿15号煤层综放面锚网支护巷道的矿压显现研究收藏指正
尝试查询
汉英释义