dry-dock
7.The ship may omit calling at any port or ports whether scheduled or not, and may call at the same port more than once; may for matters occurring before loading the goods, known or unknown at the time of such loading and matters occurring after such loading, either with or without the goods or passengers on board, and before or after proceeding toward the port of discharge, adjust compasses, dry dock, with or without cargo aboard go on ways or to repair yards, shift berths, make trial trips or tests, take fuel or stores, remain in port, sail with or without pilots, tow and be towed, and save or attempt to save life or property; and all of the foregoing are included in the contract voyage.


