dual-dual highway
3.Integrating with the task of highway capacity study,how to progr am automobiles action for dual-lane two-way highway capacity imita tion is introduced.According to the enactment of status of vehicle running and connection,model of vehicle following mode is confirmed.By the enactment of vehi cle travelling crane space,passenger car equivalents coefficient is simulated by the emluator to provide parameters for Chinese highway capacity manual.


