exit pipe
1.Combining construction of the southwest entrance-exit underpass of the Zhujiang Road Station of the Line 1 of Nanjing Subway, the author discusses and studies design parameters and construction technology of the little pipe shed method to support and excavate a large span tunnel under conditions of shallow cover soft and plastic soil, and analyzes and concludes application effects of practical projects.

