flood inundation period
1.On the base of multiple function realization of tidal level forecasting of storm-surge, dyke break flood computation, flood inundation area computation and manpower-material dispatch etc. and using fussy policy-decision method, the flood control policy-decision scheme was determined.
3.It is agreed and understood that the Insurers shall not indemnify the Insured for loss, damage or liability directly or indirectly caused by or resulting from flood and inundation.
4.It is agreed and understood that the insurers shall only indemnify the insured for loss, damage or liability directly or indirectly caused to construction plant, equipment and machinery by flood and inundation if after the execution of works or in case of any interruption, such construction plant, equipment and machinery are kept in an area not endangered by 20-year floods.
5.It is agreed and understood that the Insurers shall only indemnify the Insured for loss, damage or liability directly or indirectly caused to camps and stores by fire, flood or inundation if these camps and stores are located above the highest water level recorded anywhere on the site during the last 20 years and the individual storage units are either at least 50 m apart or separated by, fire walls.

