爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.The tidal current in this sea area is reversing current, and the duration of flood current is short than that of ebb current. During the spring, summer and winter, the averaged ebb current speed is greater than the averaged flood current speed. The maximun current speed reaches 1.82 m/s, occurring in summer, and the averaged current speed is 0.7 m/s.
该海域的潮流为往复流,涨潮流历时短于落潮流历时,春、夏、冬季平均落潮流速大于平均涨潮流速,最大流速为1.82m/s(夏季),平均流速为0.70m/s;收藏指正
2.In this paper, the characteristics of tidal current distribution in Zhapu section of Hangzhou Bay are analyzed and discussed, using the synchronous observed tidal current data obtained from 8 stations of Zhapu section during September, 2000. The results show that in the section, two current cores with a greater speed occur at flood race, the current speed in the southern part is greater than that in the northern part, and the flood current speed is greater than the ebb current speed.
根据2000年9月在杭州湾乍浦断面设置的8个潮流同步观测站的资料,对该断面潮流分布特征进行了分析和探讨,结果表明:该断面大潮涨急时呈现两个大流速核; 断面南部的流速要比北部的大,涨潮流速大于落潮流速。收藏指正
3.The flood is swelling at an unprecedented speed.
洪水以前所未有的速度上涨。收藏指正
4.During the reform and opening flood period, this company always acts as a helmsman, maintaining a high development speed.
在改革开放的浪潮中,公司一直充当着弄潮儿的角色,保持着高速发展的良好势头。收藏指正
5.Upwind finite difference and ADI method have been adopted in simulating flood processing, and this method has greatly saved EMS memory and improved computational speed.
模型建立过程中采用有限差分法的逆风格式离散控制方程 ,并用ADI方法求解代数方程组 ,模型计算速度快 ,节约计算内存 ,基本可以满足洪水实时预报要求收藏指正
6.1. The maximum current speed and SSC occour during spring ebb, and the minimum one occours during neap flood.
1.最大流速和含沙量都发生在大潮落潮,最小流速和含沙量都发生在小潮涨潮收藏指正
7.Due to issues of Dongting lake districts flood composition, the evolution of sediment flow, the river and lake (R&L) distribution characteristic as well as the layout of R &L-dredging engineering, the article simulated the model of the Dongting Lake terrain change by using the GIS technology and adopted the limited volumetric method to establish the two-dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision-making and implementation of renovation for river course, canal and harbor and river course-dredging engineering.
摘要针对洞庭湖区的洪水组成、水流泥沙演变、道湖泊水系分布特点以及道湖泊疏浚工程布局情况,利用GIS技术模拟洞庭湖地形变化,采用有限体积法建立了湖泊二维水力学计算模型预测疏浚工程实施后的水位、流量、流速流场变化,为道、航道港口整治、道疏浚清淤等工程决策与实施提供了可靠理论依据。收藏指正
尝试查询
汉英释义