爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.The principle and selection of boosting fan, pre scrubber, absorbant and its preparation,flue gas heating,oxidation system for gypsum production and the seperation and dewatering process of gypsum in the FGD retrofit project of Shidongkou Power Plant are discussed and recommended.
对石洞口电厂烟气脱硫改造工程工艺方案中有关增压风机、预洗塔、吸收剂及其制备、烟气加热、石膏氧化系统、石膏分离及脱水工艺等选择作了论述和推荐。收藏指正
2.Finite Element Computation for Accident Failure Analysis of Inlet Heating Pipe Expansion Joint of Flue Gas Turbine for CCU
催化裂化装置烟机入口暖管膨胀节事故失效分析的有限元计算收藏指正
3.In a petrochemical branch under PetroChina Group one DN300 single hinge type expansion joint of two heating pipes at flue gas turbine inlet of 100×10~4 t/a riser cracker abruptly burst at the bellows in its horizontal segment during the production,in order to analyze the cause for the failure accident,finite element computation and analysis were conducted on the failed expansion joint and improvement actions were proposed in this paper.
某石化公司100×104t/a两段提升管催化裂化装置烟机入口暖管一只DN300单式铰链型膨胀节,在生产运行过程中暖管水平段单式铰链型膨胀节波纹管突然发生爆裂,为分析失效事故原因,对失效的膨胀节进行了有限元计算与分析,并提出了改进措施。收藏指正
尝试查询
汉英释义