4.The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu. m. and the entire incinerator fluepipe from the sub-lower ground floor up to the 7th floor and above the roof of Tang Shiu Kin Hospital.
7.The discharge of circulating water to wash ash causes the ash transport pipe fouling. The fouling can be prevented by using the washing water of flue gases to wash.
8.Through real example of desulfuration project in Guohua Dingzhou Power Plant, the problems, such as slurry-freezing and blocking in the pipe conduit and other equipments, occurred in trial operation of limestone-gypsum wet type flue gas desulfuration equipment have been presented.