frame height
1.To enhance weaving efficiency,cheese quality,operation condition of weft accumulator,the veracity of weft selector and the rationality of stop frame height and heddle height were checked in producing Modal satin drill in THEMA 11E rapier loom. Through these measures,weaving efficiency can be enhanced from 83.2% to 90.25%.
3.Suqian Rengfang Zhihui Building is a 13 story reinforced concrete frame-shear wall structure with a height of 48. 9m and located in a region of high earthquake intensity.
5.Objective A new anterior cervical fuse frame(CFF) was designed to enhance the ability of the anterior cervical vertebra internal fixation device, restoration of spinal segment height and possibility of lone-term bone fusion, as well as to decrease the difficulty of procedure when implanting the prosthesis.
6.To point out the problem in the common design methods of rotor bow’s contour Through the numerical analysis by computer,the approximate relation between width height ratio of skipping curve and its root angle has been obtained,therefore,a simple and covenient method has been given out for the determination of rotor bow’s frame parameter and its contour design

