爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.A passage through which smoke and gases escape from a fire or furnace; a flue.
烟道烟和煤气从火焰或火炉中释放出来的通道;烟道收藏指正
2.A Study on Gas Distribution Pattern in a Ring-type Horizontal Baking Furnace′s Flue
水平环式焙烧火道内气流分布规律的研究收藏指正
3.RELATION BETWEEN THE VOLUME HEAT LOAD OF UPPER FURNACE AND THE FLUE GAS TEMPERATURE DIVIATION FOR TANGENTIAL FIRING BOILER
膛上部容积热负荷与煤粉锅烟温偏差的关系收藏指正
4.About 70% of the sulfur entering the furnace is discharged together with the flue gas in form of gaseous SO_2, less than 10% fixed by the fly ash, and less than 1% fixed by the bottom ash.
在入硫分中,70%左右以气态SO2形式随烟气排放,只有不到10%以固态形式富集于飞灰中,不到1%固定于底渣中。收藏指正
5.How to Reduce NOx in the Flue Gas of Refinery Furnace
如何降低炼油厂加热烟气中的NOx收藏指正
6.NaOH was added to iron blast furnace slag (BFS)/hydrated lime (HL) slurries to prepare sorbents for semidry and dry flue gas desulfurization (FGD) processes.
摘要本研究于石/氢氧化钙泥浆中添加氢氧化钠以制备烟道气除硫吸收剂。收藏指正
7.Abstract: Considering the special burning situation inside industrial furnace firebox,an infrared calculation model with elimination of the influence of flue gas was established.2-dimensional temperature patterns of furnace tube temperature in operation was obtained with infrared thermovision,which provides scientific basis for the optimization of process operation.
文摘:针对工业内特殊的燃烧环境,从消除烟气影响切入,建立了红外计算模型,并利用红外热像仪获得运行状况中管表面二维温度场及其变化特征,为优化工艺操作提供了科学依据。收藏指正
8.The consumption of electrical energy of electrically calcined furnace during calcining anthracite is studied by adjusting the length of the top electrode, the flue damper and changing the release direction of removed dust produced from charging system of electrically calcined furnace.
摘要根据电????烧无烟煤的工艺原理,通过调整上部电极长度、烟道闸板及改变电??无烟煤前上料系统通风除尘灰的排放方向等工艺控制方法,对电??无烟煤电耗进行研究。收藏指正
9.The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu. m. and the entire incinerator flue pipe from the sub-lower ground floor up to the 7th floor and above the roof of Tang Shiu Kin Hospital.
工程包括清拆及处理位于邓肇坚医院的医疗废物焚化(其容量为1立方米)及整个烟道(由下层至七楼向上伸展至医院大楼顶部之上)。收藏指正
10.The consumption of electrical energy of electrically calcined furnace during calcining anthracite is studied by adjusting the length of the top elec trode,the flue damper and changing the release direction of removed dust produce d from charging system of electrically calcined furnace.
根据电煅煅烧无烟煤的工艺原理,通过调整上部电极长度、烟道闸板及改变电煅无烟煤前上料系统通风除尘灰的排放方向等工艺控制方法,对电煅无烟煤电耗进行研究。收藏指正
尝试查询
汉英释义