hardware select
1.at the premise of assuring accuracy of data collection, stage gauging and water gate gauging station were laid out,based on the most economic system scale and investment,when laying out stage gauging station,the principle of controlling the river and branch was mainly considered; hardware select was advanced in the system,which can basically meet the needs of automatic system of hydrologic data collection and transmission and flood forecasting in theKaiduhe-and-Kongquehe irrigation district,it run stably and reliably,measure precision was high;

