爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.After comparing three repair scenarios, the following methods were chosen: injecting modified mud to heading face through mud supply tubes of the shield construction machine to block water seepage on the heading face; then maintenance worker entering the cabin under pressure to replace damaged seal and press cutterhead.
经分析对比,最终选择了从盾构机供浆管道向刀盘掘进面压注改性泥浆,对掘进面进行封堵止水,维修人员带压进舱,更换密封与压盘的方法。收藏指正
尝试查询
汉英释义