爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.On the basis of 1/10,000 active fault mapping in Fuzhou Basin, interpretation of aerial photos and detailed field investigation, 11 sites on six faults in the basin were selected for exploratory trenching. The main results of trenching are as follows: (1) Two trenches were dug across the Hutou-Miaopu Fault. One of the trenches reveals a fault plane, which is developed in lava bed and covered by Quaternary strata with an age of 75±6ka B.P.
在前人对福州盆地及其周缘活动断裂 1/ 1万填图研究的基础上 ,通过室内航卫片判读、野外详细调查等方法 ,经过详细论证 ,在福州盆地及周缘 6条活动断裂上选择了 11个认为可能是断层通过的位置 ,进行了探槽开挖。收藏指正
尝试查询
汉英释义