low-rise building
2.ε model etc. provided by professional computational fluid dynamics software Fluent 6, the 3D steady wind flow field around standard low-rise building TTU in atmospheric boundary layer is numerically simulated. The results of numerical simulation are compared with TTU field measured data and Tongji University TJ-2 wind tunnel test data.
3.After comparing all the parameters one by one and making analog calculation,client and architects determined final scheme and conclude that use of low-E cored-glass with double-coated silver is prior to others for the purpose of ensuring performance of glass for high-rise building.
4.The quality control method of pressure pumped CFG piling by continuous auger drilling is introduced, from survey, length control of pile and pouring control of mixture the key links of construction are elaborated. The composite foundation with CFG piling will be wildly applied in the construction of high-rise building with its low cost and large bearing capacity.

