2.Conclusion The instrument and equipment at the provincial CDC can only meet the requirements for routine operation, while those at the municipal abd county CDCs cannot maintain routine operation.
3.Air compressor atation is an importment installation that provides power for clasp retacder of air compressions, it has to meet the requirement of operation for its scale but it should not be too large.
4.A vacuum pumping system has been developed for the HL 1M tokamak, providing multifunction to meet the requirmemts for different operation modes. The design and trial operation of the system are described in combination with the pumping results.
6.To meet the steam demand for full-load operation of existing 4 500 kW power generator sets and sulphuric acid demand in local market, a 150 kt/a sulphur-burning sulphuric acid plant was installed.
8.Finally,according to the emulational study of TE and VBE,it presents a design of a firing and monitoring system that can meet the running requirement of the SVC. The trial operation has shown good results of the prototype design.
9.During six months trial operation,various performance indexes meet the design requirements,the transmission of GPRS network is stable,the safety and reliable operation and the production of enterprise are ensured. The design strategy is proven with certain applicable values.
10.The design and operation of physicochemical and SBR process for treatment of oil and fat refining wastewater were introduced, and effluent COD, total phosphours can meet Ⅱ-class criteria of Integrated Wastewater Discharge Standard (GB 8978—1996) with steady operation.