navigable waterway
2.In case a non-navigable stream or man-made waterway becomes navigable after a dam or sluice gate structure is built, the construction unit shall simultaneously build ship passage facilities or reserve sites for such facilities, and the expenses needed thereby incurred shall be borne by the communication departments concerned, unless there are other State-provisions applicable.
4.Based on the analysis of basic characteristics of Jinghong Reach in the Lancang River, variations of the navigable conditions caused by the regulation project in Jinghong Reach are investigated by 2-D mathematical model. The results show that the navigable conditions in the reach after implementation of the regulation project can basically meet the standards for class-V waterway.

