operation date
4.This system covers various fields concerning the operation of container wharfs, such as shipping date arrangement, vessel planning, yard planning, vessel operation and supervision, yard operation and supervision, assignment of the equipment operation tasks, wireless crane workstation, gate workstations, automatic gate systems, CFS management systems, business booking, online booking, billing system, EDI electronic data inter-exchange and report system, etc, providing swift and overall solutions to container terminal operation.
10.Trial operation of the system in Shandong power grid dem onstrates preferable and outstanding characteristics as designed, with date stre am rate as 500k-600k Bytes/min, reliability rate as not less than 93%, data tran smission speed as 54kbps~114kbps and error code rate as less than 0.1% respectiv ely.

