operational problem
1.How to prevent operational risk is a key problem of urgently required to Insurance business. Such as development of produce risk, channel of market sale risk, technology of operation risk, policy risk.
2.If you need a programmable dynamic current source, find out about operational transconductance amps. Most of the problem is figuring out when you need a programmable dynamic current source.
3.Besides NETWARE 4.12 and NETWARE 5.0, the PC server of Pentium is installed the network operational system NOVELL, whose date and clock will be false when used after 2000. We can remedy the NOVEll operational system by using the upgraded server BIOS, as can solve the clock problem of Pentium server NOVELL operational system when properly used afterwards.
4.The triangle wave generator, which is composed of FET and operational amplifier circuit, is applied to trigger circuit of automatic phase - shift of flash lamp. It solves the technical problem to view the high frequncy vibrator.
5.Timetable problem with large scale and numerous constraints is a NP-hard problem which many researchers in the operational research and computer fields have been dedicated to resolve but have not found a best solution.
6.From the angle of managerial operational research, the system of the bus-assembly line materiel logistics in this paper is devoted to solve line-side inventory supplement and vehicle scheduling problem which have to be determined in plan function step at the level of operation in logistics management.
7.Using some theories such as System Engineering,Traffic Engineering,Traffic and Transportion Engineering,Operational Research and so on,and considering comprehensively traffic,energy,land,traffic accident,environment etc,This thesis advances a new transportion mode --- Special High-speed Railway of Car to solve the problem of private car using between cities.
8.Based on APTS(Advanced Public Transportation System),the paper studies the vehicle dynamic dispatching problem for one line in BRT(Bus Rapid Transit) Systems. A real-time operational control model is developed and the corresponding algorithm is designed.
9.In order to solve the problem of the difficulty for the complicated shell in stripping away from the mould, the technical trait of the complicated shell has been analyzed, the twi-ejector using stripper plate and ejector sleeve has been designed, the mould operational principle and the structure trait have been discussed, and the die casting machine has been selected based on the swelling force calculation.

