parting stop
2.(3) Research on the key technology of the post-tensioning prestressed encircled anchorage method, including studies of concrete mix in lining and notch of anchor part, anchor and preservative system, unwanted excavattion and water-stop of ring parting, and based on those studies to raise the reliable application measures for post-tensioning initial stress methode , make suggestion for usage of those technologies.

