爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.The basic pattern during flood tides is for oceanic water to flow north into Mirs Bay, west through Victoria Harbourand north through Kap Shui Mun and the Ma Wan Channel.
潮涨时的基本模式是海水向北流入大鹏湾,西经维多利亚港,北通汲水门及马湾海峡。收藏指正
2.Numerical simulation method is firstlyadopted to describe the well pattern course of water flood ing-polymer flooding-WAG.
首次采用数值模拟方法描述了水驱-聚合物驱-气水交替驱井组驱替过程;收藏指正
3.Flooding frequency has an increasing trend in Aksu River basin since 1987. 500 hPa circulation pattern of mixed flood in flooding season of Aksu River basin is characteristics of Xinjiang High ridge steady over middle and east parts of Tianshan Mountains, and north boundary of 5 880 gpm height line steady in /over Tianshan and North Xinjiang regions and west boundary extend to south Xinjiang closed to Pamirs Plateau, and subtropical low trough in central Asia.
阿克苏流域主汛期形成混合型洪水的500hPa环流特征为:新疆高压脊稳定在天山山区中部及以东地区,5880gpm等高线北界稳定在天山上空或天山以北,西部边界在帕米尔高原以东的南疆盆地上空,中亚地区为副热带低槽活动区,环流形势相对稳定.收藏指正
4.The System skillfully takes advantage of the naturltopography and the eurved waterflowing pattern om the middle reach of the Mingjiang River, thus combining water-bifurcation, flood-diversion, sand-dredging and water-controlling as a whole gravity irrigation system, which guarantees the Chengdu Plain a land of abundance.
都江堰巧妙利用岷江出山口处的地形、水脉、水势、乘势利导,使堤防、分水、泄洪、排沙、控流相互依存,共为体系,保证了防洪、灌溉、水运和用水综合效益的发挥,孕育了举世闻名的“天府之国”。收藏指正
5.Flood in the west of Sichuan Basin is associated with the circulation pattern that two ridges located Ural and the East of Asia respectively, and a trough between Balkhash and Baykal.
川西地区的涝年与中高纬 5 0 0hPa的乌拉尔山高脊、巴尔喀什湖至贝加尔湖之间的低压槽以及亚洲东部的高脊的两脊一槽环流型密切相关 ,在这种环流型下有利于川西地区降水偏多。收藏指正
6.Abstract: This paper summarizes a series of tests and inve stigations on general layout,const ruction diversion,flood disposal,navigation,river closure,form of gate opening s ection,pattern of energy dissipation and scouring under sluice carried out for F eilaixia Proj ect by the Scientific Research Institute of PRWRC during the period from 1983 to 1998 and presents their major results.
文摘:综合阐述了珠江水利委员会科学研究所从1983—1998年间对飞来峡水利枢纽的整体布置、施工导流、泄洪、通航、截流、闸孔断面形式、闸下消能形式、闸下冲刷等所进行的一系列试验和研究工作,并介绍主要试验研究成果。收藏指正
尝试查询
汉英释义