pier to pier
9.The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier No.2 of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre-tensioning at the anchor pier.

