爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the Gantry Crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine.
当预制梁场设在高架桥下时,采用提梁机提起整孔箱梁,通过特制旋转式横移平喂梁,运架一体式架桥机运梁和架梁。收藏指正
尝试查询
汉英释义