爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Some key technical problems about construction method, vehicle velocity and clearance of the tunnel scheme were discussed according to the geographical location, engineering geological conditions, request of the harbor entrance and shipping, localization of the tunnel and some principal technical criterions.
根据泰州公路过江通道的地理位置、工程地质条件、港口航运要求、通道工程定位以及工程的主要技术标准等,对泰州公路过江隧道方案的隧道建设方法、隧道行车速度和建筑限界等若干关键技术问题进行了分析论证。收藏指正
2.Taking the results as boundary constraint and the velocity field of horizontal movement after transforming reference frame as the load of FEM node, the velocity field of horizontal movement in the region is simulated, the principal strain rate field and maximal shear strain rate field are calculated, the variety characteristics of the two rate fields and relation between the variety characteristics and strong earthquake preparation are analyzed.
将反演结果作为边界约束并将变换参考框架后的水平速度场作为有限元节点载荷,模拟区域内部水平运动场并计算其主应变率场、最大剪应变率场,以分析这两个时段中这两种场的变化特征及其与地震孕育之间的关系。收藏指正
尝试查询
汉英释义