project formulation
3.This article introduces mainly about the hydraulics monitoring results on five-grade ship lock of the Three Gorges Project during its pumping debugging period and during its trial operation period. The integrity and systematization of monitoring results are very good. It provides scientific basis for engineering acceptance and the formulation of ship-lock operation management rules.

