rapid erosion
2.Mechanism of flat-maintenance and dyke-protection of low sheet-pile groin has three principal aspects: blocking effect on the tidal bore front, alleviating erosion effect of the rapid flow of tidal bore and return-flow siltation effect during ebb tide The present paper could be used for reference of new-type groin structure as well as offer basic data for design.

