爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Analysis and Treatment of Reinforced Concrete Sewage Pool-wall Bering If Deformed and Expanded
钢筋混凝土污水处理池池壁变形过大的分析和处理收藏指正
2.As one content of project of sewage treatment engineering to be carried out at the small town in western China supported by the Holland,and also component of project——“Subzone of Sewage Treatment Single Pool and Optimum Allocation of Energy”——belonging to doctor fund project of Ministry of Education,this piece of research measures and compares AIRE-O_2 and rotary plate aerators’s capability of aeration and impetus .
作为荷兰赠款项目西部小城镇污水处理工程技术研究内容之一和教育部博士点基金项目“污水处理单池分区及能量配置优化”组成部分,本文测定并比较了AIRE-O_2 充氧机和转盘曝气机两种曝气方式的充氧及推流性能。收藏指正
3.This text has introduced the characteristics of the characteristic that the municipal sewage changes and CASS technology briefly , Propose and utilize CASS react module run and their variable to strain water flexibility who volume regulate quantity by pool, Can solve the sewage factory and design the contradiction that the scale and inflow change .
本文简要介绍了城市污水变化的特点和CASS工艺的特点,提出了利用CASS池反应模块运行数量和其可变滗水容积调节的灵活性,可解决污水厂设计规模与进水量变化的矛盾。收藏指正
4.According to these characteristics,ABR-Efficient Aeration Pool with skill of Effective Microorganism(EMO) was chosen as the main techniques. A small-scale experiment of 100 L/h and a mid-scale one of 100~200 L/h were done early and late; the various effluent indexes met the standard of "Sewage Comprehensive Discharge Standard"(GB 8978-1996).
选用厌氧折流板反应器(ABR)-高效生物曝气池工艺,引入了EMO复合菌群技术,先后进行了处理规模为100L/h和100~200L/h的小试和中试研究,好氧出水经氨氮吹脱处理后,各项指标达到《污水综合排放标准》(GB 8978-1996)规定的二级排放标准要求。收藏指正
尝试查询