1.Analyzing the character of hydrologic and silt of Xincheng Yellow River bridge, the stream design discharge is determined to be 6 500 m3/s, stream mean velocity to be 3.98 m/s, scour rate of main current to be 1.39, average grain diameter of bed overburden layer to be 30 mm;