1.I’ve studied all the necessary documentation, including the shipping advice. That advice told us the vessel would be sailing for London via Hong Kong and Bombay on October 15.Unfortunately when the vessel called at Bombay, the dockers were on strike, which caused almost ten days delay in its arrival in London.
我看了所有必要的文件.包括装船通知.船于10月15日经香港和孟买驶往伦敦.不幸的是当船在孟买停靠时.码头工人正在罢工.致使船晚到伦敦几乎10天.
2.What I’d like to remind you of is that it was stipulated in the contract that the goods would be delivered in early October.If the goods had been delivered before October 10,the strike in Bombay would not have affected the punctual arrival of the goods..Therefore you are responsible for our loss. The actual distribution started on January 10, half a month later than Christmas. The total loss amounts approximately to € 3,000.
我要提醒你的是合同中规定货物在10月上旬发出.如果货物于10月10日前发出.孟买的罢工就不会影响货物按时到达.因此.你方应对我们的损失负责.实际销售在1月10日才开始.比圣诞节迟了半个月.总共损失达3000欧元.