subway construction
4.Unifies the seismic damage performance of the kobe subway in the great han shin earthquake of japan,this article has analyzed the seismic damage characteristic of the city subway station and the sector tunnel,and discussed the seismic damage mechanism of the metro engineering,finally proposed the countermeasures for reducing seismic damage in the subway line plan stage,the aseismic design stage and the subway construction stage.
5.Based on the analysis of practice and the construction standards for urban rail transist, from the angles of planning of location, resources integration and design, this paper sums up the concept generally abode by in subway construction, and further proposes advices about the plan and design of urban rail transit construction.
6.Abstract: Introduceing the pedestrian subway construction method works and fitted technical measures with the shallow depth and covered cut method at the saturated sand layer in the city in the light of Pedestrian Subway of Xiangxi-Road Works.
7.Then the sponsor will invite a national each city subway construction conductor department, subway a programming a section, railroad construction, medium the iron tunnel survey design hospital, the railroad department first to investigate design hospital, medium the iron electrification survey design institute for research, the railroad department second to investigate design hospital, medium iron one bureau group etc. subway engineering in Xian contract for a business enterprise to meeting visit to talk over.
9.The Metropolitan Transportation Authority (MTA), the state agency that runs the subway, is still about $875m short; but construction crews are expected to start work on April 23rd.

