爱词霸英语   汉语   手机版   软件版下载 | English
每日一句:正在加载...
1.Organise the technical and commercial review and appraisal of bid documents received by Client.
针对业主收到的标书组织技术和商务的审查和评估。收藏指正
2.It has actively provided technical input for the drafting and review of the related ordinances and it also carries out statutory duties under these ordinances.
在相关的法例进行草拟或修订时,化验所会提供专业意见。化验所并会履行有关法例所授予的法定职务。收藏指正
3.Review on Technical Modification of 13 m~2 Needle-tubing ESP
13m~2针管式电收尘器技术改造评述收藏指正
4.Beyond checking the report for clarity and accuracy in the presentation of technical data, the author of a research report should review for basic grammatical and mechanical accuracy.
为了清楚和准确除检查报告中陈述的技术资料外,一份研究报告的作者应该为了基本语法和习惯性准确再检查一遍。收藏指正
5.To review the technical &commercial tender prepared by the Marketing &Tendering section and to finalise it.
审核由市场及报价科制作的技术及商务报价并最终定稿。收藏指正
6.But even a casual review of the most common network security breaches reveals more human failures than technical ones.
但随便对多数常见网络安全侵犯的检查可以发现人为错误多于技术错误。收藏指正
7.Abstract: A review for improvement and current situation about the dressing,metallurgy of platinum ores,a technical line and principal principle of treating the mineral intergrowth,technical index of floatation concentration,technical problems and troubles of treating the floatation concentrate by the hydrometallurgy.
文摘:评述了原生铂矿选冶技术发展现状,处理该类共生资源的技术路线和基本原则及其浮选富集工艺指标,湿法冶金处理浮选精矿的技术问题和难点。收藏指正
8.This paper brie fly describes the distribution, habitats and communities of Taxus and review s the methods and key technical points in producing young plants of the genus.
本文概述了红豆杉属植物的区域分布、生境和群落学研究结果 ,重点综述了幼苗培育途径及技术关键。收藏指正
9.This is a review with 40 references on the production,technology and development trends of ethylene-propylene rubber(EPR) abroad. The technical economic evaluation on four production methods of EPR was carried out.
对国外乙丙橡胶(EPR)生产概况、技术特点及发展态势作了简述,并对EPR的溶液法、悬浮法、简化悬浮法和气相法等4种生产方法作了技术经济评估。收藏指正
10.Review is made on the results of two designs for the high pressure pregrouting at the stopes of the main shaft and the auxiliary shaft in an iron mine.One design took the geological characteristics as the basis and was strictly and scientifically made.With proper construction technical measures,it brough both good technical and economical effects to the grouting engineering.The another design was made in no consideration of practice.As a result,it brought avoidable losses to the engineering.Its failure cause are analyzed.
评述某铁矿主副井工作面高压预注浆的两种设计结果:一是以地质特点为依据,严格按科学设计,施工技术措施得当,给注浆施工带来了良好的技术经济效益;二是未从实际出发进行设计,给工程造成不应有的损失,剖析其失败原因。收藏指正
尝试查询